This sector has expanded from 2001 from just three generation plants to over 40 plants in 2021. The current installed capacity in Uganda is 822 MW.
Projects in development with expected COD 2027

Cheptui
Operation data
River: Cheptui
Installed capacity: 9 500 kW
Head: 615 m
No. of turbines: 2
Annual generation: 40 000 MWh
